Should be used when the parties intend that Design-Builder pay General Contractor the Cost of the Work plus a Fee, with or without a Guaranteed Maximum Price. Downloadable document.

Member Price ... $75.00

Price: $150.00
Product Code: DBIA550
Binding: Form/Document
Publisher: Design-Build Institute of America


Please note: By purchasing this document, you are granted a one-year license from the date of purchase for use of the product. To renew the one-year license, please click here.

Are you a DBIA Member? To get your discount price, just enter your member coupon code at the bottom of the Shopping Cart screen. If you don't know your member coupon code, please call the DBIA at 1-866-692-0110.

Downloadable WORD Document DBIA Document No. 550, Standard Form of Agreement Between Design-Builder and General Contractor -- Cost Plus Fee with an Option for a Guaranteed Maximum Price (2010 Edition), ("Agreement") sets forth the terms and conditions under which the construction of the Project will be performed, and should be used when the parties intend that Design-Builder pay General Contractor the Cost of the Work plus a Fee, with or without a Guaranteed Maximum Price (GMP).

If there is uncertainty about Owner's Project Criteria, or it remains to be developed by Owner and Design-Builder jointly, a cost-plus/GMP contracting approach is desirable. Although it is possible that this Agreement could be used when Owner and Design-Builder have entered into a lump sum agreement, DBIA views this as unlikely.

Therefore, this Agreement is designed to be used with DBIA Document No. 530, Standard Form of Agreement Between Owner and Design-Builder -- Cost Plus Fee with an Option for a Guaranteed Maximum Price (2010 Edition), and including DBIA Document No. 535, Standard Form of General Conditions of Contract Between Owner and Design-Builder (2010 Edition).

It is also envisioned that Design-Builder and General Contractor will have worked together in the procurement of the prime contract. If the parties execute this Agreement after the Construction Documents are final, the Agreement should be modified accordingly.