BNi Building News

Serving the Information Needs of the Construction Industry since 1946.


Chapter 10 – Contract Incentives and Design-Build Acquisition

DBIA’s Design-Build Manual of Practice – Chapter 10 – Contract Incentives and Design-Build Acquisition

The contract between the parties is critical in determining the fate of any given design-build project. This chapter focuses on contract incentives and describes how cost incentives and award fees can be best employed in the design-build setting.

Downloadable document.

Price: $25.00
Product Code: DBIA-MOP10
Binding: Form/Document
Publisher: Design-Build Institute of America


The contract between the parties is critical in determining the fate of any given design-build project. This chapter focuses on contract incentives and describes how cost incentives and award fees can be best employed in the design-build setting.

The Design-Build Manual of Practice is an authoritative guidebook about single-source responsibility contracting Downloadable document.

Download Instructions:

  • 1. When ordering you'll will be prompted to enter a shipping address. Select the "default" shipping method of "Ground."  Don't worry, you will NOT be charged for shipping.
  • 2. After your payment is approved, a "Thank You" screen will display.  At the top of this "Thank You" screen will be link(s) to the document(s) that you ordered. Just click and download. Then save the document(s) on your computer in a place you will remember.

 

Are you a DBIA member? The Manual is free to members; either visit our website or call DBIA at 1-866-692-0110.