BNi Building News

Serving the Information Needs of the Construction Industry since 1946.


DBIA Document No. 565: Standard Form of Agreement Between Design-Builder & Design-Build Subcontractor for a Lump Sum Downloadable WORD Document

DBIA Document No. 565: Standard Form of Agreement Between Design-Builder & Design-Build Subcontractor for a Lump Sum Downloadable WORD Document

Should be used only when the parties intend that Design-Builder pay Design-Build Subcontractor a lump sum fixed price for the completion of the Work. Downloadable document.

Member Price ... $75.00

Price: $150.00
Product Code: DBIA565
Binding: Form/Document
Publisher: Design-Build Institute of America


Please note: By purchasing this document, you are granted a one-year license from the date of purchase for use of the product. To renew the one-year license, please click here.

Are you a DBIA Member? To get your discount price, just enter your member coupon code at the bottom of the Shopping Cart screen. If you don't know your member coupon code, please call the DBIA at 1-866-692-0110.

Downloadable WORD Document DBIA Document No. 565, Standard Form of Agreement Between Design-Builder and Design-Build Subcontractor -- Lump Sum, 2010 Edition ("Agreement") sets forth the terms and conditions under which the design and construction of a specified portion of the Project will be performed, and should be used only when the parties intend that Design-Builder pay Design-Build Subcontractor a lump sum fixed price for the completion of the Work.

Document 565 is appropriate where there is certainty as to Owner's Project Criteria, or if the Construction Documents are final. If there is uncertainty about Owner's Project Criteria, or it remains to be developed jointly, a cost plus fee/guaranteed maximum price ("GMP") contracting approach may be more suitable. In such case, the parties should use DBIA Document No. 560, Standard Form of Agreement Between Design-Builder and Design-Build Subcontractor -- Cost Plus Fee with an Option for a Guaranteed Maximum Price, 2010 Edition.

Download Instructions:

  1. When ordering you'll will be prompted to enter a shipping address. Select the "default" shipping method of "Ground." Don't worry! You will NOT be charged for shipping.
  2. After your payment is approved, a "Thank You" screen will display. At the top of this "Thank You" screen will be link(s) to the document(s) that you ordered. Just click and download. Then save the document(s) on your computer in a place you will remember.