BNi Building News

Serving the Information Needs of the Construction Industry since 1946.


NFPA 4 Integrated Fire Protection 2015

NFPA 4: Standard for Integrated Fire Protection and Life Safety System Testing, 2015 Edition

NFPA 4 works with NFPA 3 for systematic testing and documentation of the communication between systems!

Price: $56.00
Product Code: NFPA 4-15
Year: 2015
Binding: Softcover     Page Count: 45
Publisher: National Fire Protection Association


New NFPA 4: Standard for Integrated Fire Protection and Life Safety System Testing provides the minimum requirements for integrated testing and documentation prior to building occupancy and during a building's lifecycle. Developed to work hand-in-hand with NFPA 3, this new Standard is invaluable to the Integrated Testing Agent as well as other stakeholders in the testing process.

NFPA 4 provides testing requirements for both new and existing systems to ensure that integrated fire protection and life safety systems operate as intended. The Standard does not address testing protocol, procedures, or frequencies for individual systems.

Built around requirements formerly located in NFPA 3's Chapter 7, Integrated System Testing, this first-time NFPA Standard includes the protocol for testing procedures, responsibilities of team members, methods, and documentation for verifying the operational readiness and sequence of integrated systems.

NFPA 4 has comprehensive chapters on:

  • Administration, referenced publications, and definitions
  • General requirements including fundamental principles, integrated system testing team responsibilities and qualifications, and the test plan
  • Test methods, issues logs, and corrective action reports
  • Test frequencies including separate provisions for Initial Integrated Systems Test, Periodic Integrated Systems Testing, and Existing System Modifications
  • Annexes A and B with explanatory material and a Sample Integrated Test Plan

It covers all the procedures, methods, responsibilities, and documentation required to ensure integrated testing is done correctly, in any building regardless of age and designated use.